A Prototype of Upgrading Bepc Control System

Physics – Accelerator Physics

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

poster at ICALEPCS'01, 2 pages, 1 figure

Scientific paper

We will use EPICS toolkit [1] to build a prototype for upgrading BEPC control system. The purposes are for the following three aspects: (1) Setup a network based distributed control system with EPICS. (2) Study some front-end control technology. (3) Merge the existing control systems into EPICS. The hardware architecture consists of three physical layers. The front-end layer is VME crate, PowerPC, VME I/O modules and interface boards (VME-CAMAC and Fieldbus). The back-end layer is SUN workstation, which is used as application development. The two layers are connected via the middle layer which is 100M Ethernet. In order to preserve our investment in the hardware, the existing CAMAC hardware will remain. The CAMAC will be connected to the VME via CAMAC serial highway [2]. The operator interface will be developed with EPICS DM2K. High-level accelerator control applications will be studied as well with EPICS channel access and archive access.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

A Prototype of Upgrading Bepc Control System does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with A Prototype of Upgrading Bepc Control System, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and A Prototype of Upgrading Bepc Control System will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-632355

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.