Physics
Scientific paper
Apr 2008
adsabs.harvard.edu/cgi-bin/nph-data_query?bibcode=2008pun..conf....3m&link_type=abstract
PHYSICS OF UNSTABLE NUCLEI. Proceedings of the International Symposium on the ISPUN07. Held 3-7 July 2007 in Hoi An, Vietnam. Ed
Physics
Scientific paper
The RIKEN RI Beam Factory (RIBF) project has reached a milestone in Dec. 2006 by extracting the first beam. Its basic part, accelerators and a superconducting RI beam separator called BigRIPS are now in operation. The first experimental result, production of a new neutron-rich isotope 125Pd, was obtained in May 2007 with 345 MeV/nucleon 238U beams. The RIBF project was launched about ten years ago, encouraged by success of nuclear physics and nuclear astrophysics studies using fast RI beams produced by the accelerator facility which has been running since 1986. At RIBF, radioactive isotope (RI) beams are produced via the projectile fragmentation of heavy ions or in-flight fission of uranium ions. Most of the expected path of the r-process nucleosynthesis can be reached with the intensity higher than one particle per day. In view of its outstanding performance on the variety and intensity of RI beams, the RIBF is one of the new-generation facilities competitive to those planned in the United States (FRIB) and Europe (FAIR at GSI), and is their first realization.
No associations
LandOfFree
Studies at the Riken RI Beam Factory does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with Studies at the Riken RI Beam Factory, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Studies at the Riken RI Beam Factory will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-1697904