Physics
Scientific paper
Jul 1994
adsabs.harvard.edu/cgi-bin/nph-data_query?bibcode=1994hst..prop.5254s&link_type=abstract
HST Proposal ID #5254
Physics
Hst Proposal Id #5254
Scientific paper
This activity represents a plan for the reactivation of side 1 of the GHRS. The goal of each step of this proposal is to verify the stability of the side 1 low voltage power supply. Each step will be of a longer duration and/or increased power load. If no problems are seen in the side 1 low voltage supply during the execution of these exposure lines, a test of the side 1 high voltage will be allowed.
No associations
LandOfFree
GHRS Smov Side 1 Activation does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with GHRS Smov Side 1 Activation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and GHRS Smov Side 1 Activation will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-1255568