STS-61 Space Shuttle mission report

Physics – Optics

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Anomalies, Earth Orbits, Extravehicular Activity, Fault Detection, Hubble Space Telescope, Space Maintenance, Space Missions, Space Shuttles, Space Transportation System Flights, Spaceborne Experiments, Spacecraft Maintenance, Cameras, Electronic Control, Photometers, Plugs, Solar Arrays, Space Shuttle Ascent Stage, Space Shuttle Boosters, Space Shuttle Main Engine, Spectrometers

Scientific paper

The STS-61 Space Shuttle Program Mission Report summarizes the Hubble Space Telescope (HST) servicing mission as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the fifty-ninth flight of the Space Shuttle Program and fifth flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-60; three SSME's which were designated as serial numbers 2019, 2033, and 2017 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-063. The RSRM's that were installed in each SRB were designated as 360L023A (lightweight) for the left SRB, and 360L023B (lightweight) for the right SRB. This STS-61 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-61 mission was to perform the first on-orbit servicing of the Hubble Space Telescope. The servicing tasks included the installation of new solar arrays, replacement of the Wide Field/Planetary Camera I (WF/PC I) with WF/PC II, replacement of the High Speed Photometer (HSP) with the Corrective Optics Space Telescope Axial Replacement (COSTAR), replacement of rate sensing units (RSU's) and electronic control units (ECU's), installation of new magnetic sensing systems and fuse plugs, and the repair of the Goddard High Resolution Spectrometer (GHRS). Secondary objectives were to perform the requirements of the IMAX Cargo Bay Camera (ICBC), the IMAX Camera, and the Air Force Maui Optical Site (AMOS) Calibration Test.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

STS-61 Space Shuttle mission report does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with STS-61 Space Shuttle mission report, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and STS-61 Space Shuttle mission report will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-957346

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.