Status Update on the ISAC Control System

Physics – Accelerator Physics

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

ICALEPCS01 TUAPO28

Scientific paper

Implementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel, controls for the accelerator system, a radio-frequency quadrupole followed by a drift-tube linac, and several high-energy beam-lines were implemented and commissioned. The number of controlled devices more than doubled since the last report. An overview of relational database usage, software engineering and quality control methods used will be given.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

Status Update on the ISAC Control System does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with Status Update on the ISAC Control System, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Status Update on the ISAC Control System will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-412271

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.