Physics
Scientific paper
Jul 2008
adsabs.harvard.edu/cgi-bin/nph-data_query?bibcode=2008spie.7016e..61m&link_type=abstract
Observatory Operations: Strategies, Processes, and Systems II. Edited by Brissenden, Roger J.; Silva, David R. Proceedings o
Physics
Scientific paper
The primary scheduling requirement for the Spitzer Space Telescope has been to maximize observing efficiency while assuring spacecraft health and safety and meeting all observer- and project-imposed constraints. Scheduling drivers include adhering to the given Deep Space Network (DSN) allocations for all spacecraft communications, managing data volumes so the on-board data storage capacity is not exceeded, scheduling faint and bright objects so latent images do not damage observations, meeting sometimes difficult observational constraints, and maintaining the appropriate operational balance among the three instruments. The remaining flexibility is limited largely to the selection of unconstrained observations and optimizing slews. In a few cases, the project has succeeded in negotiating DSN tracks to accommodate very long observations of transiting planets (up to 52 hours to date with even longer requests anticipated). Observational efficiency has been excellent with approximately 7000 hours of executed science observations per year.
Comeau Susan
Garcia Lisa J.
Mahoney William A.
McElroy Douglas B.
Mittman David S.
No associations
LandOfFree
Spitzer scheduling challenges: cold and warm does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with Spitzer scheduling challenges: cold and warm, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Spitzer scheduling challenges: cold and warm will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-793813