Physics – Accelerator Physics
Scientific paper
2001-11-29
eConf C011127:TUAP019,2001
Physics
Accelerator Physics
Submitted to ICALEPCS'01. 3 pages, no figures
Scientific paper
In the initial phase of the Swiss Light Source, four insertion devices will be installed. The control system for all the ID's follows an uniform concept to allow a rapid installation schedule, while at the same time allowing for a variety in operational requirements. The components of the control system include the gap drive system with encoders, temperature monitoring, beam position monitoring, power supply controllers for corrector magnets [1] and a timing module [2]. The gap drive system requirements range from micron-level accuracy to driving double undulators in synchronism with each other and also with the other beamline elements. The local synchronism is achieved with a tightly coupled system having an intelligent motor controller and the global synchronism by extending the machine timing distribution to the insertion devices and the beamlines with the capability to add beamline-specific timing events. [1] A.Luedeke et.al.,'Digital Power supplies for the Swiss Light Source', these proceedings
Kalantari Bahman
Korhonen Tapio
No associations
LandOfFree
Insertion Device Controls at the Swiss Light Source does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with Insertion Device Controls at the Swiss Light Source, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Insertion Device Controls at the Swiss Light Source will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-177550