GREGOR telescope: start of commissioning

Physics – Optics

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

1

Scientific paper

With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

GREGOR telescope: start of commissioning does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with GREGOR telescope: start of commissioning, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and GREGOR telescope: start of commissioning will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-1375859

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.