Physics – Optics
Scientific paper
Jul 2010
adsabs.harvard.edu/cgi-bin/nph-data_query?bibcode=2010spie.7733e..18v&link_type=abstract
Ground-based and Airborne Telescopes III. Edited by Stepp, Larry M.; Gilmozzi, Roberto; Hall, Helen J. Proceedings of the SPIE,
Physics
Optics
1
Scientific paper
With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.
Balthasar Horst
Berkefeld Th.
Caligari Peter
Collados Manuel
Denker Carsten
No associations
LandOfFree
GREGOR telescope: start of commissioning does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with GREGOR telescope: start of commissioning, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and GREGOR telescope: start of commissioning will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-1375859