COS FUV Recovery from Anomalous Shutdown

Physics

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Scientific paper

This proposal consists of the steps for turning on and ramping up the COS FUV high voltage in a conservative manner after a HV anomalous shutdown. This proposal executes the same steps as Cycle 17 proposal 11893. It is divided into two distinct parts with the first consisting of a slow rampup with diagnostics and darks perfomed, followed by a ramp-down, HV off, and setting Flag 3. Time is allotted for UC Berkeley, COS Instrument Scientist, and engineering will examine data dumps, science exposures, and housekeeping telemetry. If all is well, the go-ahead will be given to proceed with the second HV rampup. The second part consists of a normal rampup with diagnostics and darks, followed by a ramp-down, HV off, and setting Flag 3. Again, UC Berkeley, COS Instrument Scientist, and engineering will examine data dumps, science exposures, and housekeeping telemetry. If all is well, this time the go-ahead will be given to clear Flag 3 and precede with normal FUV science programs.;

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

COS FUV Recovery from Anomalous Shutdown does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with COS FUV Recovery from Anomalous Shutdown, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and COS FUV Recovery from Anomalous Shutdown will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-1786466

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.