eConf C000821 (2000) FR201
Physics
Accelerator Physics
Linac 2000, FR201, 5 pages, 8 figures
Scientific paper
The disassembly of the Unilac prestripper linac of the Wideroe type took place at the beginning of 1999. An increase of more than two orders of magnitude in particle number for the most heavy elements in the SIS had to be gained. Since that time the new High Current Injector (HSI) consisting of H-type RFQ and DTL-structures for dual beam operation was installed and successfully commissioned. The High Charge Injector (HLI) supplied the main linac during that time. Simultaneously conditioning and running in of the rf-transmitters and rf-structures were done. The HSI commissioning strategy included beam investigation after each transport and acceleration section, using a versatile diagnostic test stand. Results of the extensive commissioning measurements (e.g. transverse emittance, bunch width, beam transmission) behind LEBT, RFQ, Super Lens, IH tank I and II and stripping section will be discussed. An 40Ar1+ beam coming from a MUCIS ion source was used to fill the linac up to the theoretical space charge limit. Routine operation started in November 1999.
No associations
LandOfFree
Commissioning of the 1.4 Mev/u High Current Heavy Ion Linac at Gsi does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with Commissioning of the 1.4 Mev/u High Current Heavy Ion Linac at Gsi, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Commissioning of the 1.4 Mev/u High Current Heavy Ion Linac at Gsi will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-674253