Physics – Accelerator Physics
Scientific paper
2012-02-24
Physics
Accelerator Physics
3 pp. Particle Accelerator, 24th Conference (PAC'11) 28 Mar - 1 Apr 2011: New York, USA
Scientific paper
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three sections on the basis of operating frequencies & six sections on the basis of family of RF cavities to be used for the acceleration of beam from 2.5 MeV to 3 GeV. The transition from one section to another can limit the acceptance of the Linac if these are not matched properly. We performed a study to calculate the acceptance of the Linac in both longitudinal and transverse plane. Investigation of most sensitive area which limits longitudinal acceptance and study of influence of failure of beam line elements at critical position, on acceptance are also performed.
Mishra Sangeeta
Ranjan K.
Saini Anshul
Solyak Nikolai
Yakovlev Viktor
No associations
LandOfFree
Calculation of acceptance of high intensity superconducting proton linac for Project X does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with Calculation of acceptance of high intensity superconducting proton linac for Project X, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Calculation of acceptance of high intensity superconducting proton linac for Project X will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-79401