Physics – Accelerator Physics
Scientific paper
2001-11-28
eConf C011127 (2001) TUAP002
Physics
Accelerator Physics
3 pages, no figure, ICALEPCS01
Scientific paper
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.
Chiba Jiro
Fujii Hirofumi
Furukawa Katsuhisa
Kamikubota N.
Nakagawa Hiroyuki
No associations
LandOfFree
A Control System of the Joint-Project Accelerator Complex does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with A Control System of the Joint-Project Accelerator Complex, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and A Control System of the Joint-Project Accelerator Complex will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-118397