FOS Cycle 5: Focus, X-Pitch and Y-Pitch

Physics

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Hst Proposal Id #6163

Scientific paper

After warm-up to the nominal high voltage, the trim current is set to the detector default, and the HV is set to a lower value. Spectra are then obtained with the 0.1-PAIR aperture, G190H, and the Pt-Ne lamp. The high-voltage is then varied in 200 volt increments +/- 600 volts from the nominal setting with spectra taken at each setting. This will allow for optimal focus determination. Once a optimal HV setting is determined and updates made to the PDB, a series of spectra at three different X-Bases will be made to determine the corresponding X-Pitch. Additionally, measurements with the TALEDs through the 0.1-Pair aperture will be used to determine Y-Pitch. This program may result in an instruction flow change to the detector high voltage setting, the x-pitch value, the y-pitch value. This program must be run in early Cycle 5 because the focus is sensitive to external magnetic fields. The 3 runs are to be scheduled 6 months apart.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

FOS Cycle 5: Focus, X-Pitch and Y-Pitch does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with FOS Cycle 5: Focus, X-Pitch and Y-Pitch, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and FOS Cycle 5: Focus, X-Pitch and Y-Pitch will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-1171932

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.