Physics – High Energy Physics – High Energy Physics - Phenomenology
Scientific paper
2001-11-07
eConf C011127 (2001) WEAP026
Physics
High Energy Physics
High Energy Physics - Phenomenology
3 pages, 2 figures, International Conference on Accelerator and Large Experimental Physics Control Systems San Jose, Californi
Scientific paper
A 70 GeV Proton Synchrotron Extracted Beam Lines Control System is described. About 130 Magnet Dipoles and Quadrupoles, 20 Correction Magnets, 50 Beam Collimators, BPM equipment spread over 1 Km have to be controlled. The old System was based on the PDP-11/40 and LSI-11 compatible computers and the MIL 1553 STD as a Field Bus. It successfully operated about 15 years. A new system includes home made Equipment Controllers based on I 8051 Processors, CAN Field Bus, FECs, Servers, Consoles connected by Ethernet. On the first stage of modernization PDPs and LSIs are replaced with PCs connected by Ethernet. Equipment controllers are being successfully tested in the Collimators and Corrector Magnets Controls during a run.
Alferov V.
Bordanovski Y.
Ilukin V.
Klimov Stanislav
Kuznetsov Vitaly
No associations
LandOfFree
U-70 Proton Synchrotron Extracted Beam Lines Control System Modernization does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with U-70 Proton Synchrotron Extracted Beam Lines Control System Modernization, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and U-70 Proton Synchrotron Extracted Beam Lines Control System Modernization will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-102691