Preliminary cryogenic performance of the Shuttle Infrared Telescope Facility

Computer Science – Performance

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Cryogenic Cooling, Performance Tests, Space Infrared Telescope Facility, Space Shuttle Payloads, Spaceborne Telescopes, Temperature Control, Cooling Systems, Instrument Packages, Liquid Helium, Mass Flow Rate, Remote Sensors, Space Commercialization, Supercritical Flow, Superfluidity

Scientific paper

The Shuttle Infrared Telescope Facility (SIRTF) is a cryogenically cooled telescope in the one-meter aperture class designed for sensing in the infrared from 2-200 microns. This facility is designed to be flown many times on the Space Shuttle with varying instrument complements. All components of the SIRTF within the field of view of the optics are cryogenically cooled. The primary coolant is supercritical helium which is stored in an external tank and routed through the telescope - cooling the instruments first, then the optical components and finally the baffles. For detector cooling below 6K small reservoirs of superfluid helium (He II) are provided. The SIRTF cryogenic system is designed to automatically control the tank pressure and telescope flow rates during prelaunch operations and flight as well as meet the Space Shuttle environmental and safety requirements. Temperatures maintained in the telescope are a function of instrument operation, design, energy dissipation, and telescope pointing angle. By control of the cryogen flow rate any selected instrument temperature can be maintained within fixed limits, and the critical secondary mirror can be maintained below 10K throughout a 14-day mission. Instrument thermal design is a critical factor in the maintenance of proper temperature differences in the experiment package. Design of a cryogenic telescope for space use presents many problems which do not exist in earth based systems. The limited opportunity for servicing, the restricted coolant supply, and the remote instrumentation and control all provide new considerations for the instrument and system designers.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

Preliminary cryogenic performance of the Shuttle Infrared Telescope Facility does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with Preliminary cryogenic performance of the Shuttle Infrared Telescope Facility, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Preliminary cryogenic performance of the Shuttle Infrared Telescope Facility will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-883004

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.