VLTI auxiliary telescopes: assembly, integration and testing

Astronomy and Astrophysics – Astronomy

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Scientific paper

As part of the Very Large Telescope Interferometer (VLTI), ESO signed in June 1998 a contract with AMOS S.A. covering the design, manufacturing and testing of the Auxiliary Telescope System (ATS), including three movable auxiliary telescopes (AT) and the associated site equipment. The project entered into manufacturing phase in mid-1999. As a prime contractor, AMOS S.A. had to deliver complete and fully operational telescopes ready to plug on any of the thirty stations of the VLTI sub-array. This work required an overall system level approach involving a multi-skilled team. This paper depicts the progress status and presents the results of the main tests -- except optical testing -- performed on the telescopes in AMOS facilities. Those tests are the earliest verification of high-level requirement specifications such as optical path length (OPL) stability, pointing error, main axis dynamic response, performed on the telescope fully integrated.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

VLTI auxiliary telescopes: assembly, integration and testing does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with VLTI auxiliary telescopes: assembly, integration and testing, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and VLTI auxiliary telescopes: assembly, integration and testing will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-915219

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.