Planck S/C Thermal Testing Mechanical and Thermal GSE Design and Manufacturing

Computer Science

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Scientific paper

During the test, a thermal balance of the service module (SVM) will also be performed. This paper is about the test facility that is under manufacturing at CSL for the Planck S/C Thermal and Cryogenic test. AMOS sa has the responsibility of the design, manufacturing and acceptance of the mechanical part of this project, under the responsibility of CSL. AMOS sa works in close collaboration with CSL for the dimensioning of the GSE linked to the tests of the Planck spacecraft. CSL has the contract directly from Alcatel Space for these tests. This work is done in the frame of the ESA Herschel / Planck project with Alcatel Space as prime contractor. Hereafter the various items that compose the Cryogenic Test Facility are briefly described.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

Planck S/C Thermal Testing Mechanical and Thermal GSE Design and Manufacturing does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with Planck S/C Thermal Testing Mechanical and Thermal GSE Design and Manufacturing, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Planck S/C Thermal Testing Mechanical and Thermal GSE Design and Manufacturing will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-1173275

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.