Computer Science
Scientific paper
Aug 2004
adsabs.harvard.edu/cgi-bin/nph-data_query?bibcode=2004esasp.558..541d&link_type=abstract
Proceedings of the 5th International Symposium on Environmental Testing for Space Programmes Noordwijk, The Netherlands (ESA SP-
Computer Science
Scientific paper
During the test, a thermal balance of the service module (SVM) will also be performed. This paper is about the test facility that is under manufacturing at CSL for the Planck S/C Thermal and Cryogenic test. AMOS sa has the responsibility of the design, manufacturing and acceptance of the mechanical part of this project, under the responsibility of CSL. AMOS sa works in close collaboration with CSL for the dimensioning of the GSE linked to the tests of the Planck spacecraft. CSL has the contract directly from Alcatel Space for these tests. This work is done in the frame of the ESA Herschel / Planck project with Alcatel Space as prime contractor. Hereafter the various items that compose the Cryogenic Test Facility are briefly described.
Armand Paul
Chisogne J.
Collin Bertrand
Delrez Christophe
Domken Isabelle
No associations
LandOfFree
Planck S/C Thermal Testing Mechanical and Thermal GSE Design and Manufacturing does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with Planck S/C Thermal Testing Mechanical and Thermal GSE Design and Manufacturing, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Planck S/C Thermal Testing Mechanical and Thermal GSE Design and Manufacturing will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-1173275