Lunar surface operations. Volume 4: Lunar rover trailer

Mathematics – Logic

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Lunar Mining, Lunar Roving Vehicles, Lunar Surface, Trailers, Load Carrying Capacity, Lunar Rocks, Lunar Soil, Towing

Scientific paper

The purpose of the project was to design a lunar rover trailer for exploration missions. The trailer was designed to carry cargo such as lunar geological samples, mining equipment and personnel. It is designed to operate in both day and night lunar environments. It is also designed to operate with a maximum load of 7000 kilograms. The trailer has a ground clearance of 1.0 meters and can travel over obstacles 0.75 meters high at an incline of 45 degrees. It can be transported to the moon fully assembled using any heavy lift vehicle with a storage compartment diameter of 5.0 meters. The trailer has been designed to meet or exceed the performance of any perceivable lunar vehicle.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

Lunar surface operations. Volume 4: Lunar rover trailer does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with Lunar surface operations. Volume 4: Lunar rover trailer, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Lunar surface operations. Volume 4: Lunar rover trailer will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-1070654

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.