Evaluation of the SUBARU Telescope control system in-shop test erection

Other

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

1

Scientific paper

On-shop test erection has been carried out at the Hitachi Zosen factory in Osaka since 1996. The purpose of this on- shop erection is to check and adjust the sizes of parts, to minimize the assembling errors, to test the telescope drive and active support system of the primary mirror, and to review the processes of final assembling. The alt-azimuth Subaru telescope structure weighting 500 ton is supported by six hydrostatic oil-film pads and is driven successfully by direct drive. The additional test for the instrument rotator drives, cable wrappers, and other were also carried out. We report the preliminary results of the control efficiency.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

Evaluation of the SUBARU Telescope control system in-shop test erection does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with Evaluation of the SUBARU Telescope control system in-shop test erection, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Evaluation of the SUBARU Telescope control system in-shop test erection will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-1047359

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.