Critical paths and topological structure of the Earth's gravity field.

Mathematics – Logic

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

2

Earth: Gravitation

Scientific paper

A topological approach to the investigation of the properties of the Earth's gravity field is considered within the frame of critical points theory; in this connection the nature of critical points of gravity on the equipotential surfaces of the gravity field is studied and the concept of critical paths of gravity in the Earth's space is introduced. The links between a variational formulation of the problem of the path-dependence of levelled height differences in geometric levelling and the topological structure of the gravity field along critical paths are shown.

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

Critical paths and topological structure of the Earth's gravity field. does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with Critical paths and topological structure of the Earth's gravity field., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Critical paths and topological structure of the Earth's gravity field. will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-765158

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.