NASA's Chandra X-ray Observatory (formerly AXAF) was launched on July 23, 1999 and is currently in orbit performing scientific studies. Chandra is the third of NASA's Great Observatories to be launched, following the Hubble Space Telescope and the Compton Gamma Ray Observatory. One of four primary science instruments on Chandra, and one of only two focal plane instruments, is the Advanced CCD Imaging Spectrometer, or ACIS. The ACIS focal plane and Optical Blocking Filter needed to be launched under vacuum, so a tightly sealed, functioning door and venting subsystem were implemented. The door was opened two and one-half weeks after launch (after most out-gassing of composite materials) and allowed X-rays to be imaged by the ACIS CCD's in the focal plane. A failure of this door to open on-orbit would have eliminated all ACIS capabilities, severely degrading mirror science. During the final pre- flight thermal-vacuum test of the fully integrated Chandra Observatory at TRW, the ACIS door failed to open when commanded to do so. This paper provides a somewhat technically expanded description of the efforts, under considerable time pressure, by NASA, its contractors and outside review teams to investigate the failure and to develop modified hardware and procedures which would correct the problem.
Doyle Keith B.
Kahan Mark A.
Plucinsky Paul P.
Podgorski William A.
Tice Neil L.
No associations
LandOfFree
ACIS door failure investigation: technical details and mitigation procedures does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with ACIS door failure investigation: technical details and mitigation procedures, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and ACIS door failure investigation: technical details and mitigation procedures will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-1094805