Astronomy and Astrophysics – Astronomy
Scientific paper
Feb 2003
adsabs.harvard.edu/cgi-bin/nph-data_query?bibcode=2003spie.4838..101n&link_type=abstract
Interferometry for Optical Astronomy II. Edited by Wesley A. Traub. Proceedings of the SPIE, Volume 4838, pp. 101-107 (2003).
Astronomy and Astrophysics
Astronomy
2
Scientific paper
Mitaka optical and InfraRed Array second phase instrument, MIRA-I.2, has obtained the first fringes on 8th June 2002 at a baseline of 30m and the second fringes on 13th August. MIRA-I.2 consisting of two 30cm siderostats was proposed and started designing in 1994. Major constructions started in April 1999 just after the first phase instruments MIRA-I.1 was closed. The telescopes were initially put at a 6m test baseline in the MIRA-I.1 dome and obtained fringes in June 2001 and then moved to the 30m baseline in August 2001. At present, some of parts do not reach the final shape. Observations of star radii or binary orbits will be planed, while remained construction will be continued.
No associations
LandOfFree
Status report on Mitaka optical and infrared array (MIRA-1.2) does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with Status report on Mitaka optical and infrared array (MIRA-1.2), we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Status report on Mitaka optical and infrared array (MIRA-1.2) will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-914927