Computer Science – Performance
Scientific paper
Dec 2002
adsabs.harvard.edu/cgi-bin/nph-data_query?bibcode=2002aas...20115108t&link_type=abstract
American Astronomical Society Meeting 201, #151.08; Bulletin of the American Astronomical Society, Vol. 35, p.577
Computer Science
Performance
1
Scientific paper
The Allen Telescope Array will consist of 350 fixed six-meter dishes at the Hat Creek Radio Observatory in northern California (land use permits pending). It is the first massively parallel array ever built. Where possible, components from consumer markets and mass-production manufacturing processes have been used to lower costs. The architecture of the array explicitly anticipates future growth as a result of "Moore's Law" improvements. There will be many novel features of this array including ultra-wideband instantaneous frequency coverage from 0.5 to 11 GHz, a very wide field of view (2.5 degrees across at 21 cm), miniaturized 80K cryogenics, full bandwidth analog data transmission from the antennas to the Myhrvold central processing facility, dynamic null-formation and tracking of satellite interferers, and continuous multi-user support for radio astronomical research and SETI explorations.
Starting in July 2000, the technology development for this array has been a collaboration between the Paul G. Allen Foundation and the ATA team located at the SETI Institute and at the Radio Astronomy Laboratory at UC Berkeley. A rapid prototyping array (RPA) consisting of seven COTS antennas and room temperature L-band receivers was erected in Orinda, CA in March 2001. Thanks to strong and continuing support from Sun Microsystems, the RPA has provided an invaluable testbed for software development and evaluation of RFI mitigation schemes.
An operational 3-element Production Test Array (PTA) has been implemented at Hat Creek Observatory over the last few months. The antennas, drives, monitor and control software, and frontend components are near-final versions to be manufactured for the full array. This poster provides performance data from the first few months of testing with the PTA. A final decision on commitment for construction is expected by April 1, 2003.
ATA 25 person Team
Blitz Leo
Paul Allen Foundation Collaboration G.
Tarter Jill C.
No associations
LandOfFree
Recent Performance Testing Results Using the 3-element Production Test Array for the Allen Telescope Array does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.
If you have personal experience with Recent Performance Testing Results Using the 3-element Production Test Array for the Allen Telescope Array, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Recent Performance Testing Results Using the 3-element Production Test Array for the Allen Telescope Array will most certainly appreciate the feedback.
Profile ID: LFWR-SCP-O-1891663