Lunar Transportation Facilities and Operations Study, option 1

Computer Science

Scientific paper

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Aerospace Systems, Centaur Launch Vehicle, Hydrogen Oxygen Engines, Lunar Exploration, Lunar Landing, Lunar Launch, Space Transportation, Checkout, Lunar Surface, Prelaunch Tests, Spacecraft Maintenance, Storable Propellants

Scientific paper

Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE and PSS by reviewing and commenting on architecture documents and concept definitions to ensure adequate considerations were given to the launch and landing function of an exploration initiative.

No affiliations

No associations

LandOfFree

Say what you really think

Search LandOfFree.com for scientists and scientific papers. Rate them and share your experience with other people.

Rating

Lunar Transportation Facilities and Operations Study, option 1 does not yet have a rating. At this time, there are no reviews or comments for this scientific paper.

If you have personal experience with Lunar Transportation Facilities and Operations Study, option 1, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Lunar Transportation Facilities and Operations Study, option 1 will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFWR-SCP-O-1038804

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.